Home » Free Calculators » Tender Bid / No-Bid Score Calculator

Score a tender opportunity with the weighted bid/no-bid method.
Rate each factor 1–5 (5 = most favourable to bidding) and weight by importance.

Bid factors (score 1 = least favourable, 5 = most favourable; weights in %)
Client / employer
Relationship, payment history, reputation & financial standing. 5 = strong, reliable client.
%
Margin / profitability
Expected margin vs the firm's target. 5 = healthy margin.
%
Capacity / workload
Spare resource vs current workload, labour, plant, bonding, cash flow. 5 = ample free capacity.
%
Project & contract risk
Scope clarity, site conditions, programme, onerous terms. 5 = LOW risk (favourable).
%
Strategic fit
Alignment with long-term strategy: sector, geography, key client, future benefit. 5 = strong fit.
%
Competition / win chance
Competitive position: few bidders, incumbency advantage. 5 = strong win chance.
%
Decision thresholds (company-specific aspiration level)
%
Weighted score at/above which to BID
pp
Below threshold by up to this → REVIEW; further below → NO-BID
Set factor scores and weights to score the opportunity
Weighted additive worth: overall = Σ(w·s) ÷ Σw, expressed as a percentage and banded against the bidder's aspiration level (Ahmad 1990). The factor set, weights and 70 % / 10 pp defaults are subjective and company-specific, edit them to suit your firm.
For decision support only: the final bid/no-bid call rests with your bid committee.

About this bid/no-bid score calculator

This free bid/no-bid score calculator helps construction contractors decide whether a tender opportunity is worth pursuing. Rate six factors, client and employer, margin and profitability, spare capacity and workload, project and contract risk, strategic fit, and competitive position, on a 1 to 5 favourability scale, weight each by importance, and the tool returns a single weighted score and a clear BID, REVIEW or NO-BID recommendation. It is aimed at estimators, bid managers and directors who want a consistent, defensible way to triage tender invitations before committing scarce estimating resource to a full price.

How the bid/no-bid score is calculated

The model is the standard simple additive weighted scoring (SAWS) method. Each factor i carries a score s (1–5) and a weight w in per cent; the overall worth is the weighted average Σ(w·s) ÷ Σw, expressed as a percentage of the maximum (5). That percentage is then compared with the bidder's aspiration level, bid at or above the threshold, review within the band below it, and decline further below. Risk uses the same scale with no sign inversion, so 5 means lowest risk. Method per Ahmad, I. (1990), Decision-Support System for Modeling the Bid/No-Bid Decision Problem, ASCE Journal of Construction Engineering and Management 116(4), with the factor set drawn from Ahmad & Minkarah's survey of US general contractors. The factors, weights and the 70 % threshold / 10 pp review band are deliberately company-specific defaults, edit them to match your firm's appetite.

Reviewed by
Managing Director at Ensign Software. Over 20 years working with UK mechanical, electrical, MEP, ductwork and insulation contractors.
Each calculator cites the standard it follows. For design guidance only: always verify the result with a qualified engineer.

Frequently asked questions

What is a bid/no-bid decision?

It is the early go/no-go judgement a contractor makes on a tender invitation, deciding whether the opportunity is worth the cost and effort of preparing a competitive price, before any detailed estimating begins. A structured score keeps that decision consistent across opportunities and reviewers.

How should I score the risk factor?

Risk is rated on the same favourability scale as every other factor, so a higher number is better: 5 means low, well-understood risk, clear scope, good ground conditions, a sensible programme and fair contract terms. While 1 means high risk. There is no sign inversion to remember.

Can I change the weights and threshold?

Yes. The default weights and the 70 % aspiration level with a 10 pp review band are starting points, not standards. Adjust the weights to reflect what matters most to your business and set the threshold to your own risk appetite; the recommendation updates as you type.

See Ensign in action

Book a free demo and find out how Ensign can save your business time and money.

By completing this form, you are opting in to receive marketing emails from us. You can unsubscribe at any time.